Brightman Street Bridge
The Middlesex Corporation constructed the approach span and bascule span superstructure, concrete piers, control house, abutment and retaining walls, and electrical and mechanical equipment for the operation and control of the bascule spans for the Brightman Street Bridge Replacement.
The work on the bridges included construction of reinforced concrete piers and abutments, excavation, embankments, mechanically stabilized earth walls, steel box girder superstructure, steel plate girder superstructure, concrete bridge decks, bridge railing and joints.
2014 – Eagle Level Winner in Excellence in Construction-GC Mega Projects $200M+
2014 – Excellence, Heavy, Civil
2013 – Best Highway/Bridge Project
2013 – Best Project
By the Numbers
2 MI
Roadway Construction
45K SF
MSE Walls
15M LBS
Structural Steel
470 T
H-Piles
125K CY
Excavation
24K CY
CIP Concrete
$219M
Project Value
Scope of Work
- Construction of approach span and bascule span superstructure
- Performed pile driving, cast-inplace concrete footings piers and superstructure concrete deck
- Temporary cofferdams
- Erected steel tub girders for the approach spans and ramp span
- Control house construction and fit-out
- MSE walls and abutment
- Operate and maintain bascule
- Electrical work including primary power warning gates and lights,
Unique Challenges
- Extensive work performed from barges
- Erection of bascule leafs with multiple cranes – the heaviest pick was 322K pounds
- Installation of all mechanical equipment
- Employed cold weather concrete procedures to maximize work progress and maintain project schedule