Orlando International Airport – South Airport APM Complex

Aviation, Heavy/Civil Infrastructure
CM at Risk
Orlando, FL
Greater Orlando Aviation Authority
Award Winner

The Middlesex Corporation provided construction services for the South Airport APM Complex Program under Bid Package 03.

This project was broken into 2 contracts – GMP 1B and GMP 4, where we worked as General Contractor to the Construction Manager at Risk (CMAR), Hensel Phelps. GMP 1B consisted of sitework including pond construction, storm water, and erosion control; GMP 4 consisted of roads, bridges, and MSE walls.

2017 – Best of The Best Airport/Transit

By the Numbers

215 acres
Site Prep and Clearing

775K CY, including 20-acre pond
Embankment

31K LF
Storm Drain

340
Storm Structures

800 LF of twin 10’x10’ culvert
CIP Box Culvert

2, with 6.3K LF of 18” precast concrete pile
Bridges

550 CY
Concrete Substructure

350 CY
Superstructure

80K SF
Retaining Walls

16K T
Asphalt Paving

6.5K SY
Concrete Paving

100
Peak Workforce

$40M
Project Value

Scope of Work
  • Sitework, roadways, bridges
  • Maintenance of Traffic for road closures during construction
  • Concrete road pavement, milling and resurfacing, concrete traffic separator
  • Roadway and parking lot striping
  • Lighting and signage
  • Erosion control measures – silt fencing, floating turbidity barriers, inlet protection
  • Grading and drainage stormwater improvements