Orlando International Airport – South Airport APM Complex
The Middlesex Corporation provided construction services for the South Airport APM Complex Program under Bid Package 03.
This project was broken into 2 contracts – GMP 1B and GMP 4, where we worked as General Contractor to the Construction Manager at Risk (CMAR), Hensel Phelps. GMP 1B consisted of sitework including pond construction, storm water, and erosion control; GMP 4 consisted of roads, bridges, and MSE walls.
2017 – Best of The Best Airport/Transit
By the Numbers
215 acres
Site Prep and Clearing
775K CY, including 20-acre pond
Embankment
31K LF
Storm Drain
340
Storm Structures
800 LF of twin 10’x10’ culvert
CIP Box Culvert
2, with 6.3K LF of 18” precast concrete pile
Bridges
550 CY
Concrete Substructure
350 CY
Superstructure
80K SF
Retaining Walls
16K T
Asphalt Paving
6.5K SY
Concrete Paving
100
Peak Workforce
$40M
Project Value
Scope of Work
- Sitework, roadways, bridges
- Maintenance of Traffic for road closures during construction
- Concrete road pavement, milling and resurfacing, concrete traffic separator
- Roadway and parking lot striping
- Lighting and signage
- Erosion control measures – silt fencing, floating turbidity barriers, inlet protection
- Grading and drainage stormwater improvements