I-75 SR 93 from Pasco County Line to S of US 98-SR 50-Cortez
This project consists of improvements to 5.5 miles of I-75 (SR 93) from the Pasco/Hernando County Line to South of US 98/SR 50/ Cortez Boulevard in Hernando County.
Improvements include roadway, structures, drainage, geotechnical, traffic control, utilities, subsurface utility engineering, intelligent transportation systems and signing, and pavement marking. Other associated efforts include public involvement, hazardous materials, Right of Way, utility coordination, and environmental permitting. Construction of this project resulted in added capacity, safety, and mobility to the corridor.
2017 – Merit Award Transportation Roadways
By the Numbers
13K T
Temporary Asphalt Pavement
310K CY
Excavation
300K CY
Embankment
8
Stormwater Ponds
48’ long extension of 15’x12’ crossing
Cattle Crossing under I-75
100K T
Limerock Base
60K T
Superpave Asphalt Pavement
125
Drainage Structures
18K FT
Storm Pipe
21
Jack and Bores
350K SY
Grading and Sodding
$35M
Project Value
Scope of Work
- Widening the existing 4-lane divided rural interstate to a 6-lane divided rural section
- Construction, milling, resurfacing, and widening of pavement
- New barrier system installation, guardrails
- Construction of permanent median crossover
- Clearing and grubbing, curb and gutter, fencing, sodding
- Jack and bores
- Box culverts
- Overhead sign structures, signage and pavement markings, ITS, utilities
- Traffic control
- Drainage
- Pier protection walls