SR 91 Resurfacing and Safety Upgrades for Turnpike Mainline

Paving
Osceola County, FL
Florida Department of Transportation, Turnpike Enterprise
Award Winner

This asphalt milling and resurfacing bid-build project is representative of Middlesex Paving’s commitment to safety, quality, timeliness, and cost effectiveness. The final surface evaluation of the ride quality indicates this section of the Turnpike is now one of the smoothest roadways in all of Florida.

The contract work on this section of the FDOT Turnpike involved milling and resurfacing over 9 miles of 4-lane limited-access highway, including access ramps. The work included areas of “deep” milling for extensive repair and cross-slope corrections for safety improvement. The Laser Smoothness Acceptance report of final surface evaluation for the ride quality (RN and IRI both) indicates this section of roadway is certainly one of the smoothest roadways in Florida. This project was completed on time, with minimal disruption to the travelling public, and completed under the original $11.9M unit price contract.

2018 – Smoothest Pavement of the Year Runner Up: Limited Access Roadway

By the Numbers

60,000 tons
Asphalt

13,900 tons
FC-5 friction

>100%
Net Quality Composite Pay Factor (CPF)

4.3
Average RN

33
Average IRI

$11.3M
Project Value

Scope of Work
  • Milling and Resurfacing of 9.6 miles of Turnpike highway
  • Two northbound lanes and two southbound lanes, including paved shoulders
  • Milling and Resurfacing of 10 access ramps
Unique Challenges
  • Worked within lane closures during restricted hours maintaining traffic volume of 36,000 vehicles per day
  • Coordinated work so Turnpike could maintain toll operations on various ramps.