SR429 Widening Tilden Road To FTE
This project covered all components needed to widen SR429 from Tilden Road to Florida’s Turnpike from 4 general use lanes to 6 general use lanes; widening the inside (median) to accommodate an additional general use travel lane in each direction with full depth shoulders.
Also included is the widening of the mainline bridges within the project limits to accommodate the appropriate shoulder widths, additional general use lanes and ramp modifications.
The project also included construction of sound barriers, overhead sign structures and intelligent transportation systems (ITS) infrastructure in Orange County.
2022 – FTE Road Builder of the Year
By the Numbers
26K LF
Concrete barrier walls, traffic railings combined
18K LF
Conduit and cabling
175
Light poles
225K+ LF
Fiber optics
94
Overhead signage structures
150K SY
Milling
160K SY
Stabilization
100K Tons
Asphalt
75
Pavement markings
22K LF
Drainage pipe
173
Drainage structures
$89M
Project value
Scope of Work
- Concrete barrier walls, traffic railings
- Bridge widenings
- Roadway widening
- Overhead signage
- Electrical / ITS
Unique Challenges
- Tight schedule and high levels of coordination between subcontractors and vendors.
- Value engineering options presented post-bid allowing for elimination of temporary critical walls.
- DOT allows for precast sound wall use; expedites schedule.
- Phased construction with multiple lane shifts.